Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Quikrete Home Additions & ADU: The Arlington Owner’s Guide
We build Quikrete-compatible home additions and ADUs in Arlington, and a finished addition runs $45,000 – $130,000 depending on square footage, foundation work, and finish level. We’re an independent local contractor, not affiliated with Quikrete. If you’ve landed here, you’re probably holding a bag of Quikrete in an Arlington yard and wondering whether the concrete, mortar, or setting material you bought matches what your addition actually needs – or you’re staring at a slab, pier, or stem wall that has started to crack, chalk, or erode not long after it went in. Here’s the plain truth on the material, where it fails, and what it costs to get the build right.
Key Takeaways
- A full home addition in Arlington runs $45,000 – $130,000; a detached or attached ADU runs $90,000 – $220,000.
- Quikrete covers a range of products (concrete mix, mortar, fast-setting patchers, bonding agents), and getting the right formula for the job matters more than any single brand badge.
- Expansive clay soil under most of Arlington is the number-one killer of slabs and footings, not the mix itself.
- Permits and inspections aren’t optional for additions and ADUs. Every eligible job gets a permit pulled and an inspection signed.
- We back completed work with the written 90-Day Done Right Promise.
Which Quikrete Products This Applies To
Quikrete isn’t one product. It’s a family: Concrete Mix, Sand/Topping Mix, Fast-Setting Concrete, High-Strength Concrete, mortar mixes for masonry, and bonding or patching agents. Each has its own bag color, mix ratio, and cure window, and each behaves differently in the Texas heat. Matching the right one to your addition means reading the bag carefully. Look for the psi rating and the “fast-setting” versus standard labeling – a fast-setting mix used on a large footing pours too stiff and starts to set before the crew finishes. The 80 lb bags are common at box stores, but an addition typically calls for bulk delivery and a mixer, not hand-mixed bags.
When it comes to the OEM-versus-aftermarket decision, there’s no “Quikrete model” the way there’s a garage-door model. The bag is the material; the spec is the mix design. What matters is whether the concrete meets the engineer’s requirement for your footing, typically 2,500 – 4,000 psi depending on the load, and whether joints, vapor barriers, and rebar are placed correctly. That’s what fails first: not the brand, the installation detail. If you’re pairing a new addition with a kitchen or bath inside, we also install premium fixtures like KraftMaid cabinets, Cambria quartz, and Silestone counters.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Quikrete Home Additions & ADU Is Failing
- Hairline cracks spreading from corners or along door frames. Shrinkage cracks are normal if they’re thin and stay put; widening cracks usually mean the footing is moving on Arlington’s clay.
- Chalky, powdery surface on the slab or stem wall. Efflorescence or dusting from a mix that cured too fast in the sun and lost surface strength before it set.
- Doors and windows that stick or don’t line up. Often the first sign that a slab has heaved. Arlington’s black clay swells when wet and shrinks when dry, and a shallow footing can’t hold it.
- Crumbs or voids at the foundation edge or in mortar joints. Weak mix, poor troweling, or a footing poured without proper compaction underneath.
- Water pooling against the new stem wall. Grading that drains toward the addition, which undermines the footing and feeds cracks over time.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
For an Arlington addition, expect $45,000 – $130,000 installed. The range is driven by square footage, whether the addition needs a pier-and-beam versus slab, and finish level (drywall, flooring, HVAC tie-in, windows). A garage conversion runs $30,000 – $80,000, and a standalone or attached ADU runs $90,000 – $220,000. Concrete and foundation work alone typically make up 15 – 25% of that total. Every price change is a written change order presented before work moves, so you’re never handed a surprise invoice at the end. We pull permits and have inspections signed on eligible jobs, and every completed job carries the 90-Day Done Right Promise in writing.
DIY or Call Us?
You can safely inspect slab cracks, check grading, probe for soft spots along the footing, and note door and window alignment. That’s useful information. What we don’t recommend is pouring a footing or stem wall yourself on a habitable addition. A mistake in the mix, rebar spacing, or footing depth shows up months later, and by then it’s expensive to undo. The concrete material itself isn’t the danger – the buried structure is. If you need a permit and a signed inspection, that’s not a bag-of-mix job. Call (888) 590-9867 for a free estimate, and we’ll walk the site with you before anyone orders material.
FAQs
A properly poured, permitted addition on good footing should last 40 to 50 years or more in Arlington. The slab or pier system is what determines lifespan, not the brand on the bag, so footing depth and soil compaction matter most.
Often, yes. Cracked or settled slabs can sometimes be stabilized with underpinning or piering instead of a full rebuild, which saves significant cost. The trigger is movement.
A modest addition takes 3 to 6 months from permit to final inspection; an ADU takes 5 to 9 months depending on size and utility work. Most of the delay is the permit and inspection process through Arlington, not the concrete pour.
We match the mix to the engineer’s spec for your footing and order through a local ready-mix supplier, not the box store, because large pours need bulk delivery and consistent slump. Quikrete products work fine for small patches and repairs, but an addition needs engineered mix design.
Call (888) 590-9867 for a free estimate. We’ll look at your foundation, talk through permits, and give you a written scope before any material is ordered.
Written by the team at Barrett & Sons Construction Arlington, serving Arlington and nearby areas.