James Hardie Home Additions & ADU: The Arlington Owner’s Guide
James Hardie-compatible home additions and ADUs in Arlington typically run $45,000 – $130,000 for an addition and $90,000 – $220,000 for a full ADU, and a garage conversion lands between $30,000 – $80,000. These are planned builds, so we schedule them like a build: a written scope, permits pulled, inspections signed, and a workmanship warranty at the end.
Owners usually figure out something’s wrong in one of two ways. Either the siding on an older addition has started swelling, chalking, or growing green algae along the north wall, or they’ve finally priced a new ADU for aging parents or a grown kid and don’t know what a real number looks like. Both bring people to us, and both get the same answer: here’s what it actually costs in Arlington and why.
Key Takeaways
- Additions run $45,000 – $130,000; ADUs $90,000 – $220,000; garage conversions $30,000 – $80,000.
- James Hardie fiber cement handles North Texas sun and hail far better than vinyl or wood, which is why we use it on the exteriors we build.
- Every addition and ADU we build gets permits pulled and inspections signed – the inspector works for you, not for us.
- Every price change shows up in a written change order before the work moves forward.
Which James Hardie Models This Applies To
James Hardie siding shows up on Arlington additions under a handful of product lines, and the right spec depends on which one is already on your wall or which one you want for the new square footage. The common ones are HardiePlank lap siding, HardiePanel vertical siding, HardieShingle, and HardieTrim boards for corners, fascia, and window casing. If you’re matching an existing addition, look at the back of a spare board or the printed label – James Hardie stamps the series and the exposure width right onto the product. HardiePlank typically comes in 5.25″ and 6.25″ exposed lap widths with a 3/8″ thickness; getting that match wrong on a visible wall reads instantly.
On the OEM-versus-aftermarket question: for fiber cement there’s no “part” to swap in the way there is with a garage door spring. It’s a material decision, and the honest version is that James Hardie brand product and a quality fiber cement equivalent both perform, but only if the board, trim, and fastener spec match what’s already on the wall. Mixing a thinner aftermarket board next to existing HardiePlank telegraphs through the paint in about a season. We spec the material in writing before a nail goes in, so you know exactly what’s going on your addition in Arlington before the first pallet lands.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your James Hardie Addition or ADU Exterior Is Failing
Fiber cement is durable, but it’s not immortal, and in Arlington’s climate – long humid summers, hail in spring, and sun that bakes the south and west faces – you’ll see failures on a predictable schedule. Here’s what to watch for:
- Chalking and dulling paint on the west wall. North Texas UV breaks down paint faster on west and south exposures. If the finish looks chalky after a few summers, the paint is failing before the siding is.
- Swelling or soft spots near the base. That usually means water is wicking up from the foundation or a downspout is dumping right against the wall. Fiber cement resists rot but not indefinitely, and the cause needs fixing before the board does.
- Green algae or dark streaks along the north side. Shade plus Arlington humidity grows algae on fiber cement. Some of it cleans off; some of it means the board is holding moisture.
- Popped or rusting fasteners. Wrong fastener spec or a corroded nail lets the board work loose. On a new addition this is a build-quality issue, not an age issue.
- Gaps at trim and casing. Caulk fails first at joints, and water gets in behind the board at the casing. That’s a re-caulk now, replace later situation if you ignore it.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Here’s the honest installed-price picture for Arlington, and the ranges track our other build pages so you’re not comparing apples to oranges:
| Project | Installed Range (Arlington) |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
What drives the range: square footage, foundation work, whether the addition shares a wall or needs a full new roof plane, and what the interior finish allowance covers. Those allowances are written into the scope, because the allowance that isn’t on paper is a surprise waiting for a date. Labor, framing, sheathing, siding, and finish are all in the number you sign. Every completed job carries our written 90-Day Done Right Promise – if it’s not right, you make one call and we come back.
DIY or Call Us?
You can safely check the exterior of an existing addition or ADU yourself. Look for chalky paint, soft spots at the base, popped fasteners, and failed caulk at the trim. Take a photo, note the age of the build, and you’ll have a real picture of what needs attention.
What I’d steer you away from is trying to tack new siding onto a failing wall or frame an addition yourself. Once you’re opening a wall on a home addition – moving a load path, tying into an existing roofline, or running a new foundation – you’re into structural and permit territory, and pulling the wrong nail can mean water and structural problems a season later. That’s the part that needs a licensed crew and an inspector’s signature. Call (888) 590-9867 and we’ll walk your addition or ADU and give you an honest estimate.
FAQs
James Hardie fiber cement typically lasts 20 to 30 years or more in North Texas when it’s installed with the right fasteners and caulk and repainted on schedule. The paint finish usually needs refreshing every 8 to 12 years here, and the west-facing walls age fastest because of UV. Call (888) 590-9867 for an honest read on your existing addition.
Often yes – a spot repair of one or two failed boards, a re-caulk, or a repaint solves most issues. If soft spots and moisture are spreading, replacing the affected wall section is the right call. We’ll tell you which one you’re looking at after we walk it.
A garage conversion runs roughly 8 to 12 weeks, an addition 3 to 6 months, and a full ADU 6 to 9 months, depending on permits and finish selection. We give you a written schedule up front and update you when inspections land.
We spec the exact James Hardie product line, exposure width, and trim in your written scope, then source through a supplier that carries the brand – so you know what’s going on your wall before the truck unloads. KraftMaid, Cambria, and Silestone come into the interior picture the same way, specified in writing.
Written by the team at Barrett & Sons Construction Arlington, serving Arlington and nearby areas.
Call (888) 590-9867 for a free estimate on your James Hardie addition or ADU in Arlington. No trip charge inside the county, a free second opinion on any written estimate you already have, and a permanent 10% Senior & Veteran discount. We’re an independent builder and not affiliated with James Hardie – just a company that builds with their product and stands behind the work.