Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
KraftMaid Home Additions & ADU: The Arlington Owner’s Guide
If you’re planning a KraftMaid-equipped addition or backyard ADU in Arlington, the finished project typically runs $45,000 – $130,000 for a home addition and $90,000 – $220,000 for a detached ADU, and we schedule free estimates rather than same-day starts. That price covers framing, permits, inspections, finishes, and the cabinetry and storage KraftMaid is known for. Most Arlington owners reach this page after a smaller failure points at the bigger question: a sagging cabinet run, a sticking door on a new build, a soft spot in a floor. Those symptoms usually trace back to moisture, settling, or framing that wasn’t squared to begin with. We’ll walk through what a KraftMaid addition really costs in Arlington and how to tell whether the part or the whole system is failing.
One note up front: Barrett & Sons Construction Arlington is an independent local contractor. We are not affiliated with KraftMaid, and we don’t speak for them. We install KraftMaid cabinetry alongside Cambria, Silestone, and Kohler fixtures when owners want them.
Which KraftMaid Models This Applies To
KraftMaid builds cabinet lines across several series, and the installation details for an addition or ADU depend on which one you have. Half-height wall cabinets, tall pantry towers, and base runs each carry their own rough-in expectations, and the door style and finish affect how the cabinet behaves against a new wall. The most useful thing you can do is locate the spec sticker. Inside the door on the cabinet frame you’ll usually find the series name, the box dimensions, and a finish code. Photograph it before you measure anything.
The bigger compatibility gotcha isn’t the cabinet – it’s the wall behind it. In an addition or ADU, cabinets hang on framing we build, so the critical measurement is how true that wall is. A KraftMaid box that’s square to the millimeter will still rack if the stud plane wanders more than about 1/8 inch over the run. In north Texas, we also spec a gap and vapor consideration between cabinet backs and exterior walls, because summer humidity swings push wood. OEM vs. aftermarket matters less here than for a single failed part, because you’re not swapping one hinge. You’re building a room the cabinet will live in for years.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your KraftMaid Home Additions & ADU Is Failing
When an addition or ADU goes sideways, it rarely announces itself. It shows up as a cascade of small symptoms. Here are the ones we see most in Arlington homes:
- Doors that stick seasonally. A door that swells shut in summer and frees up in fall points to humidity moving through the envelope. It usually means vapor barrier or ventilation in the new space wasn’t done right.
- Cabinets pulling away from the wall. If a KraftMaid run is separating at the top, the framing behind it was likely out of plane or the fasteners weren’t hitting studs. Left alone, the gap widens.
- Soft or bouncy floors near exterior doors. In older Arlington additions this often traces to water wicking in at the threshold. It’s a grading and flashing problem, not a cabinet problem.
- Condensation on interior walls or windows. That’s a sign the new space traps moisture because the HVAC and ventilation weren’t sized for it. Cabinets and finishes pay the price first.
- Ceiling cracks spreading from room corners. Hairline cracks from drywall tape are normal in a new addition as it settles. Cracks that widen over months suggest foundation movement or framing that wasn’t tied in properly.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Here’s what a KraftMaid-equipped addition or ADU runs in Arlington right now:
| Project | Installed Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
| Cabinet Installation | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
| Backsplash Installation | $800 – $2,500 |
| Kitchen Island Installation | $3,000 – $10,000 |
What drives the range: square footage, foundation type, whether you’re building attached or detached, the KraftMaid series and finishes you pick, and how much site work the lot needs. Every scope and allowance is written into the contract, and any price change arrives as a written change order before work moves. Permits are pulled and inspections signed on every eligible job. All work is backed by our written 90-Day Done Right Promise.
DIY or Call Us?
Here’s the honest split. You can safely photograph your KraftMaid spec sticker, measure the room, note where cracks and gaps are showing, and check that exterior doors close squarely. Those are checks, not repairs. The line is foundation work, framing, electrical for the new space, and gas or HVAC tie-ins. Those aren’t DIY territory in any jurisdiction we work in, and a home addition permit in Arlington requires licensed trades and inspections. Skipping that step is how a project turns into a teardown. If your symptoms are cosmetic and isolated, we’ll tell you. If they run deeper, call (888) 590-9867 and we’ll take a look.
FAQs
Built right, forty-plus years is realistic for the structure, with cabinet refresh along the way. The finish on KraftMaid cabinetry typically holds up well for a decade or more before it needs attention, and the structure lasts far longer if the envelope and ventilation are done correctly. The failures we see are almost always flashing, vapor, and grading details, not the brands.
Sometimes yes, and it depends on what’s actually failing. A stuck cabinet door is a hinge or hardware fix. A soft floor near a door is a tear-out and flashing repair. A crack spreading along a ceiling corner is usually a foundation or framing issue that needs diagnosis before anyone quotes a fix. We’ll tell you which side of that line you’re on.
A home addition typically runs four to six months from permit to punch list, and a detached ADU runs longer, often six to nine months. Garage conversions are the fastest, usually eight to twelve weeks. Weather, inspection scheduling, and KraftMaid lead times all move the timeline, and we’ll give you a written schedule before the first day.
We order KraftMaid through authorized distribution and specify Cambria, Silestone, and Kohler as finish partners when owners want them. Every product is named on the contract so you can look up the exact model before you sign. If KraftMaid discontinues a line mid-project, we bring you the substitute options in writing before anything is ordered.
If you’re weighing a KraftMaid addition or ADU in Arlington, the smartest first step is a free estimate with the scope written out line by line. Call (888) 590-9867 to schedule yours. We answer the phone with a live person, day or night, and we’re happy to give you a free second opinion on any written estimate you already have.
Written by the team at Barrett & Sons Construction Arlington, serving Arlington and nearby areas.