Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
PGT Home Additions & ADU: The Arlington Owner’s Guide
If you’re planning a PGT-spec home addition or ADU on an Arlington property, the honest answer is that additions run $45,000 – $130,000 and detached or garage-conversion ADUs run $90,000 – $220,000 installed, and we schedule the site walk and written scope rather than promising a same-day build. The reader who lands here usually got there the hard way: a plan set from a PGT dealer, a set of measurements that don’t match the lot, an HOA or city reviewer who flagged something on page nine, or a framing stage that came in a foot short of what the drawings called for. We match the PGT plan and product specification to Arlington’s actual lot conditions, then build to it with written scope, written allowances, and written change orders before any framing goes up.
Which PGT Models This Applies To
PGT offers additions and ADU plan packages across its window and door product lines, and the spec that matters on your job is the one stamped on your plan set – not a generic “PGT-compatible” claim. The gateway is the series designation on your window and door schedule: if your addition is speced with PGT Aluminum or Vinyl series units, those dictate wall openings, rough-in dimensions, and the header schedule in your plan. A common compatibility gotcha in Arlington: a plan set drawn for a WinGuard or impact-rated product line will not close out with a non-impact substitution at final inspection – and a 2026 code reviewer in Tarrant County will catch it. To identify the right spec, pull the window schedule and the ADU floor plan from your plan set (the dealer who sold it can resend it), then bring those to the site walk. We’re an independent builder, not affiliated with PGT, so we read your spec and build to it. OEM plan modifications come from the dealer; framing, MEP rough-in, and finish come from us.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your PGT Home Additions & ADU Is Failing
An addition or ADU doesn’t “fail” like a window seal – it fails at build-out. Here’s what we see in Arlington:
- Framing comes up short against the plan. A crew that didn’t read the PGT window schedule sets rough openings to standard instead of the unit spec, and the trim-out is 1 – 2 inches off. That’s not a PGT problem, it’s a plan-reading problem, and it shows up when the windows arrive.
- Foundation and slab don’t match the ADU footprint. If the plan was drawn for a specific footprint and the slab was poured from a sketch, the finished room is out of square and the tie-in to the main house has a gap. Ask to see the survey and the slab layout overlaid before pour day.
- Windows and doors specified but not ordered. A change order should arrive in writing before scope moves – not a verbal “we’ll figure it out.” If a unit is short, the job stops and you wait 6 – 10 weeks in TX lead times.
- Permit status “pending” for weeks. Arlington permits for additions and ADUs go through plan review; a job that starts before the permit is issued is a job you may have to tear back out. That’s a hard stop, and we won’t start without a signed permit.
- Utility trenching and tie-in not in the plan. Water, sewer, and electrical tie-ins to a detached ADU are the most overlooked line item in the PGT plan package, and they’re the most common surprise charge when a crew “discovers” them mid-build.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Installed PGT-spec home additions in Arlington run $45,000 – $130,000; ADUs run $90,000 – $220,000; and garage conversions run $30,000 – $80,000. What drives the range is footprint, foundation (slab vs pier-and-beam), the window and door package from your PGT schedule, and MEP tie-in distance. Every price arrives as a written scope, every allowance is in writing, and every change comes as a written change order before work touches the job. Permits are pulled and inspections signed on every eligible job. Every completed build is backed by the written 90-Day Done Right Promise, and our crew members carry the Barrett & Sons name – not dispatched strangers. For kitchen and bath finishes inside an ADU we spec KraftMaid, Cambria, and Silestone like we would in a main-house remodel.
DIY or Call Us?
An owner can safely handle some of this: pull your PGT plan set and window schedule, photograph the survey and lot, confirm the ADU footprint and foundation type, and check your permit status on the Arlington permit portal before signing anything. What an owner should not do is frame, pour, or tie in utilities to a plan they can’t verify. The danger here is not a spring under tension – it’s a structural addition tied to the wrong footprint. An off-square slab, an under-sized header, or a utility trench cut through an unmarked line causes real damage that shows up months later. If the plan and the site don’t match, stop and call us at (888) 590-9867 for a free second opinion on any written estimate before you sign – the trip is free inside the county.
FAQs
A properly built addition lasts 50+ years; an ADU the same if the foundation and envelope are right. The PGT windows and doors speced into the job carry their own manufacturer warranty, and the structure is ours – so the 90-Day Done Right Promise covers the build, not the window unit’s factory seal. In Arlington’s clay soils, the foundation is what determines the lifespan, and that’s the part worth getting right on the front end. Call (888) 590-9867 for an exact quote – estimates are free.
Yes, sometimes. If the failure is a single rough opening or a trim-out mismatch, we reset the opening to the PGT spec and save the rest. If the failure is plan-level (wrong footprint, wrong window series, missing utility tie-in), that’s a rebuild of the affected section, not a repair. A site walk tells us which.
A home addition in Arlington typically takes 3 – 5 months from permit issuance; a detached or garage-conversion ADU takes 4 – 7 months. Plan review and permitting add 6 – 10 weeks on top of that. Nobody builds an addition same-day, and anyone who tells you otherwise has not pulled a permit.
We source the PGT window and door units from the plan set your dealer provides, and we order to your window schedule – not to a guess. Material and fixture selections come from named brands, not mystery suppliers off a van. If a substitution is proposed, it comes to you as a written change order before it ships.
If you’re ready to plan a PGT-spec addition or ADU in Arlington, call (888) 590-9867 for a free estimate. A live person answers the phone 24/7 – not a voicemail box, not an out-of-state call center. Ask about our permanent 10% senior and veteran discount, the $40 off any repair over $200, and the free second opinion on any written estimate.
Written by the team at Barrett & Sons Construction Arlington, serving Arlington and nearby areas.