Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
CGI Home Additions & ADU: The Arlington Owner’s Guide
CGI-compatible additions and ADU packages installed in Arlington typically run $45,000 – $130,000, and the realistic path is a written scope and a permit first, not an afternoon swap. That’s not just an inconvenience. It means the work is planned, permitted, and inspected. The part that usually starts the call isn’t a single broken component. It’s a soft spot you find under a baseboard, a sliding door that won’t close after a wet spring, or an energy bill that climbed in a room that used to hold steady.
Key takeaways
- Arlington additions usually land between $45,000 and $130,000 depending on size, foundation, and finish level.
- The perimeter, roof tie-in, and slab or pier work are what fail first, and those are where we spend time.
- CGI parts and panels exist in multiple revisions and series, so the model label matters more than the photo you text us.
- Every eligible job gets permits pulled and inspections signed, and price changes come in writing before work starts.
Which CGI Models This Applies To
Part matching on a CGI addition starts with the label. Look on the underside of the roof deck panel for a manufacturer sticker with the series code, the revision letter, and the panel dimensions. CGI has run several revision lines over the years, and two pieces that look identical can have different width tolerances at the wall plate. A panel from one series won’t mate cleanly with the rail from another, and forcing it creates the kind of squeak that never goes away.
On the older sub-floor fastening kits, the bolt holes are drilled at one width. On the newer ones they sit a quarter-inch wider apart to meet current wind uplift tables. That difference is invisible once installed, which is why we ask Arlington homeowners to send us a photo of the label, not a photo of the part.
When the OEM version of a bracket or flashing is discontinued, a quality aftermarket equivalent is often fine. But you want the same gauge, the same galvanized finish, and the same anchor pattern. KraftMaid, Cambria, and Silestone are the brands we install most often in interior finishes for these projects, and they hold up because the substrate underneath is right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your CGI Addition or ADU Is Failing
Arlington sits in a climate that swings hard. Long dry summers and clay close to the surface, then heavy spring rain. That combination punishes a foundation that wasn’t built to move.
- Doors and windows that bind in one season and free up in another. That’s the foundation settling unevenly, not a hardware problem. Shim it and you mask it for a year.
- Hairline cracks at the wall-to-ceiling seam. These usually track a roof tie-in that wasn’t flashed correctly on the original install, and water is finding its way in behind the drywall.
- Soft spots in the sub-floor near a doorway or exterior wall. Water has been getting under the threshold from a settled pier or a failed flashing piece, and the OSB is drinking it.
- A musty smell that returns after rain. That’s typically the crawl space or slab edge, not the living room paint. Ventilation and grading are the fix, and they both fall to the foundation work.
- A room that never holds temperature. Under-insulated panels, a poorly sealed perimeter, or an HVAC run sized for the original square footage before the addition existed.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
An addition for an Arlington home lands in the $45,000 – $130,000 range. The spread is driven by size, foundation type (pier and beam vs. slab), how much custom finish work you want, and whether a new bathroom or kitchen run is part of the plan. A separate ADU build runs $90,000 – $220,000, and a garage conversion comes in at $30,000 – $80,000.
| Scope | Installed range |
|---|---|
| Home addition | $45,000 – $130,000 |
| ADU construction | $90,000 – $220,000 |
| Garage conversion | $30,000 – $80,000 |
Parts and labor are broken out line by line in the estimate. Every allowance is written. Every scope change gets a change order before we touch it. No surprise invoice at the end. Completed work is covered by the 90-Day Done Right Promise.
DIY or Call Us?
Here’s the honest split. You can pull the manufacturer label and read the series code, and you can check grade around the foundation for water pooling against the wall. That’s real diagnostic work and it helps us price the job before we arrive. What you shouldn’t do is start pulling roof flashing or opening a pier cap to see what’s underneath. Flashings are load-bearing and water-management components, and a re-tarred lap that fails on the first storm is a real mess. Foundation and structural corrections are load-bearing work that needs a permit and an inspector.
If something under your addition looks soft or wet, stop poking at it. Call (888) 590-9867 and we’ll walk you through what to check without opening anything.
FAQs
How long does a CGI addition or ADU last in Arlington? A well-built addition holds up 30 to 50 years if the foundation and roof are done correctly from the start. The variables are drainage, pier depth, and flashing, not the brand on the panel. Call (888) 590-9867 for an exact quote, and estimates are free.
Can you repair a failing section instead of replacing the whole addition? Often yes. A localized soft spot or a bad flashing tie-in can be repaired without a full rebuild, though foundation movement usually needs correction, not patching. We’ll tell you which one you’re looking at after the inspection.
How long does the work take? A garage conversion runs several weeks of active construction. A full addition or ADU takes longer and depends on permit timing with the city of Arlington. We give you a schedule in writing before we start.
How do you source the CGI-compatible parts? We read the model label, cross-check the series and revision, and pull the right part from suppliers we’ve worked with. OEM when it’s available, a same-spec aftermarket equivalent when it’s not, and you get the brand name on the estimate either way.
If you’ve got a failing addition in Arlington, the fastest path is a real look. Call Barrett & Sons Construction Arlington at (888) 590-9867 for a free estimate. We’re an independent contractor and not affiliated with CGI.
Written by the team at Barrett & Sons Construction Arlington, serving Arlington and nearby areas.