A Barrett company - serving Arlington, TX

American Standard Home Additions & ADU in Arlington, TX

Home additions & ADUHome additions & ADU
Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

American Standard Home Additions & ADU: The Arlington Owner’s Guide

We build and install American Standard-compatible home additions and ADU projects in Arlington, and a full addition typically runs $45,000 – $130,000 installed, while a detached or attached ADU ranges from $90,000 – $220,000 depending on size, foundation, and utilities. These are planned projects, not same-day work – a real addition takes weeks to months, and we quote it in writing before anything gets ordered. Arlington homeowners usually come to us after an insurance adjuster, a failed inspection, or a structural report flags something wrong. More often than not, what failed isn’t the framing or the roofline. It’s a single component inside the assembly – a header, a tie-down, a vapor barrier, a window flashing detail – that quietly gave out years before anyone noticed.

Call (888) 590-9867

Which American Standard Models This Applies To

American Standard doesn’t make home additions or ADUs the way it makes fixtures. So when a homeowner tells us they have an “American Standard” addition, what they usually mean is one of two things: the addition was built using American Standard-compatible modular components (pre-hung doors, windows, plumbing rough-ins, or panelized wall systems sold through building supply channels), or they’re conflating three brands. We also service KraftMaid, Cambria, and Silestone in the same homes, and in Arlington we’ve walked into plenty of jobs where all four names got tangled. The practical way to sort it out is to find the data plate. Check the interior face of any American Standard exterior door or window, the inside of the crawlspace hatch, or the panel edge on any modular wall section. Photograph the model and serial number, measure the opening or panel width, and bring the photo to us. OEM parts for American Standard-compatible building components are still available through commercial supply houses, but lead times run longer than they did five years ago, and aftermarket equivalents from suppliers like Pella or Marvin often spec tighter and ship faster. On any structural component, though, we don’t swap OEM for aftermarket without a stamped engineering match. That’s the one place we won’t cut a corner.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Signs Your American Standard Home Additions & ADU Is Failing

You’ll know something’s wrong before you know what. These are the symptoms we see most in Arlington additions and ADUs, and what’s usually underneath them.

  • Doors and windows that stick in one season and swing free the next. That’s almost always header deflection or foundation movement, not a bad hinge. In North Texas clay soil, an addition that wasn’t pinned and tied properly will move every spring.
  • Water stains on the ceiling near the addition-to-house tie-in. The flashing detail at the roofline where the new roof meets the old is the number one failure point we find. It’s a $400 – $1,800 repair if caught early, a $8,000 – $20,000 roof replacement if it’s been leaking two winters.
  • A musty smell in the ADU or addition that never goes away. Crawlspace vapor barrier failure or a missing capillary break under the slab. Arlington’s humidity does the rest.
  • Hairline cracks that run diagonally from the corners of doors and windows. Some are cosmetic. Diagonal cracks that widen over months are structural and need a licensed engineer’s eye, not a drywall patch.
  • An inspection report that cites “no permit on file” for the addition. This is the one that sinks resales in Arlington. Unpermitted additions get flagged, and the fix is either retroactive permitting or documented remediation, both of which we handle.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Replacement Cost & What’s Included

Full home additions in Arlington run $45,000 – $130,000, and ADU construction runs $90,000 – $220,000. The range depends on square footage, foundation type, whether you’re adding a bathroom or kitchenette (which pulls in plumbing and electrical rough-in), and how much structural work ties into the existing house. A garage conversion sits lower at $30,000 – $80,000 because the shell already exists. What drives the spread within each range:

  • Foundation and site work – clay soil in Arlington means deeper piers and more excavation than flat-rock markets.
  • Utility runs – running water, sewer, and electrical from the main house to a detached ADU is often the single biggest line item.
  • Finishes – KraftMaid cabinetry, Cambria or Silestone counters, and GAF or CertainTeed roofing add to the number, but they’re brand-name materials you can look up and price yourself.

Every price change arrives as a written change order before work happens. That’s the rule. We don’t hand you a surprise invoice at the end because we forgot to write down an allowance. Permits get pulled and inspections signed on every eligible job, and every finished project carries our written 90-Day Done Right Promise. Our technicians have up to 28 years of experience, and the crew that shows up is background-checked and accountable to a name you can verify.

DIY or Call Us?

An owner can safely check a few things: photograph the data plate, measure the opening or panel, note where water is staining, and pull the permit history from the city. That’s detective work, and it saves us a trip.

What you shouldn’t touch is anything structural. Header replacement, foundation piering, roof-to-wall flashing on a tie-in, and any electrical or gas rough-in for an addition or ADU are not weekend jobs. Done wrong, they fail inspection, void insurance, or worse – and we’ve seen all three in Arlington. If the addition was built without permits, the first move is a licensed engineer and a permit application, not a YouTube tutorial.

Call (888) 590-9867 and we’ll look at it together. Estimates are free, and a second opinion on any written estimate you’ve already got costs you nothing.

FAQs

Need Construction help nationwide? Licensed & insured · free written estimates
Call (888) 590-9867
Local Service Coverage

Request a Free Estimate in Arlington

Tell us what you need - Barrett & Sons Construction Arlington responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Call Now - 24/7 Dispatch