A Barrett company - serving Arlington, TX

Jerith Home Additions & ADU in Arlington, TX

Home additions & ADUHome additions & ADU
Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Jerith Home Additions & ADU: The Arlington Owner’s Guide

We build additions and ADUs that tie into existing Jerith-railed and Jerith-trimmed exteriors, and installed home addition projects in Arlington run $45,000 – $130,000 while a full ADU lands between $90,000 and $220,000. Those figures cover the structure, the tie-in, and the permit work, and we don’t start a job without a written scope. We’re an independent contractor, not affiliated with Jerith – we work with the material, not for the company.

Call (888) 590-9867

Here’s how it usually starts. An Arlington owner has a Jerith porch railing or panel system that’s been part of the house for fifteen years, and now they want a 20-by-24 addition off the back. The railing runs where the new wall needs to go. Or the connection point has rusted through at the post base and the whole run is loose. The call comes in because the addition has to meet an existing system and nobody wants to guess how that junction was built. That’s the moment this page is for.

Which Jerith Models This Applies To

Jerith made its name in ornamental aluminum fencing, railing, and porch systems, and those products show up constantly on Arlington homes built from the 1990s forward. The company’s residential lines are the ones you’ll find here – the aluminum railing series and panel fence systems that use square pickets and channel rails. Commercial-grade Jerith is a different animal, and we rarely see it on a single-family lot in Arlington.

Identifying the right material starts with the sticker. Jerith parts carry a manufacturer label on the underside of the top rail or inside the post cap. If the label is gone, measure the top rail width – the residential series run to a consistent dimension that you can match against current catalog specs. Take a photo with a tape measure in frame. That photo saves a trip.

The OEM-versus-aftermarket decision matters more than most people expect. Jerith’s factory replacement rail sections are exact matches, and for a structural tie-in to a new addition, exact matters. Aftermarket aluminum rail can work for a short infill run, but the picket spacing and the finish tone often don’t line up, and on a house where the railing is visible from the street, a mismatch reads as an unfinished job.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Signs Your Jerith Home Additions & ADU Is Failing

What we hear from Arlington owners, and what’s usually underneath it:

  • Wobble at the post base. The mounting plate has lost its anchor to the concrete or deck rim, or the base plate itself has corroded through. Aluminum doesn’t rust the way steel does, but it does pit and chalk in Texas sun, and a loose anchor is the most common failure we find.
  • Chalking and paint loss on the top rail. That white powdery film is aluminum oxidation, accelerated by our summer heat and the UV here. Left alone it spreads and the finish starts to flake. It’s cosmetic until it isn’t, and the fix is prep and recoat, not replacement.
  • Rattling or loose pickets. The rivets or fasteners holding the picket to the rail have worked loose. On a walk gate or a porch run, that rattle is the first sign the section is moving more than it should.
  • Gaps where the railing meets the house. The connection point has opened up, often because the original install didn’t leave room for expansion or because the addition framing was never properly tied to the existing wall. This one needs eyes on it – a gap at the wall connection is a water entry point in Arlington rain.
  • Gate sag or a latch that won’t catch. The hinge post has shifted or bent. On a Jerith walk gate, the latch is set to a tight tolerance, and a post that’s out of plumb by a quarter inch makes the gate hang wrong every time.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Replacement Cost & What’s Included

Replacement and tie-in work on Jerith systems around an addition breaks down like this for Arlington:

  • Home addition (full build, including exterior tie-in): $45,000 – $130,000
  • ADU construction: $90,000 – $220,000
  • Garage conversion to living space: $30,000 – $80,000

What drives the range: square footage, foundation type (slab versus pier and beam matters here), whether the addition needs a new roofline tied to the existing one, and the extent of the Jerith railing work. A short rail run that gets relocated is a small line item. A full perimeter system that has to come out and go back in a different configuration is not.

We price parts and labor separately so you can see what the material costs. Every scope change arrives as a written change order before work starts. Every eligible job gets permits pulled and inspections signed, and the finished work is backed by the 90-Day Done Right Promise in writing.

DIY or Call Us?

You can safely check a few things yourself. Photograph the manufacturer label if it’s still there. Measure the top rail with a tape and note the dimension. Check whether the post base moves when you push on the post – a firm push tells you if the anchor is gone. Look at the connection point where the railing meets the house and see if there’s daylight or a gap.

Where DIY goes wrong: relocating or re-anchoring a Jerith post into new framing, cutting a rail section to infill against a new wall, and anything involving the structural tie between the addition and the existing home. A post that’s anchored into the wrong substrate will come loose in one or two Arlington summers, and an addition that isn’t tied to the existing structure properly is a foundation question, not a railing question. That work is where you want someone who’s done it.

Call (888) 590-9867 and we’ll come look at it. Estimates are free, and we’ll write down what we find before you commit to anything.

FAQs

How long does a Jerith aluminum railing system last in Arlington? A well-installed Jerith aluminum system holds up for 20 to 30 years here, but the finish is the weak point – our UV and summer heat chalk it faster than manufacturers’ literature suggests. Expect to recoat every 6 to 8 years to keep it looking right.

Can a failing Jerith section be repaired instead of replaced? Often, yes. Loose rivets can be re-set, a corroded base plate can be replaced, and a chalking rail can be prepped and recoated. Full replacement makes sense when the picket sections are bent or when the run is being reconfigured for an addition. We tell you which one it is after we look.

How long does the swap take? A single rail section or post replacement is usually a one-day job. Railing work that’s part of an addition happens on the addition’s schedule, not on its own timeline. We’ll tell you exactly where it falls in the written scope.

How do you source the Jerith part? We order against the manufacturer label or against measured specs from the photos we take on site. We don’t carry Jerith parts and we don’t stock them – it’s an order, not a pull off a shelf, and we’ll tell you the lead time up front.

We also install and work around KraftMaid, Cambria, and Silestone finishes if your addition includes a kitchen or bath, and those get the same written scope treatment.

Call Barrett & Sons Construction Arlington at (888) 590-9867 for a free estimate on your Jerith tie-in or addition work. A live person answers, day or night. You’ve got $40 off any repair over $200, a free second opinion on any written estimate you’ve already received, no trip charge inside the county, and a standing 10% discount for seniors and veterans. Ask anyone on your street – or look up the license number yourself before you sign anything.

Written by the team at Barrett & Sons Construction Arlington, serving Arlington and nearby areas.

Need Construction help nationwide? Licensed & insured · free written estimates
Call (888) 590-9867
Local Service Coverage

Request a Free Estimate in Arlington

Tell us what you need - Barrett & Sons Construction Arlington responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Call Now - 24/7 Dispatch