Fast, Reliable Home Additions & ADU Across Bedford
If you’re planning a room addition or an ADU on your lot in Bedford, the biggest surprise usually isn’t the framing – it’s the architectural review. Bedford’s Architectural Review Committee looks at style, materials, and height compatibility with the surrounding 1960s-1980s tract homes, and that step alone can add roughly 4-6 weeks before a permit is even issued. We’ve spent years working inside that process, and it shapes how we schedule every job in Bedford. Call (888) 590-9867 and we’ll walk you through what your project actually needs before a nail moves.
Why Barrett & Sons Construction Arlington Is Bedford’s Preferred Home Additions & ADU Company
Bedford is a fully built-out mid-cities suburb, which means almost every addition we look at is infill work – a kitchen bump-out, a second story, or a detached ADU tucked behind an existing ranch. There’s very little new greenfield development here, so we’re always tying new structure into older framing, slab, and utility systems. That’s a different kind of job than building fresh, and it’s most of what we do in Bedford.
We pull permits and get inspections signed on every eligible job, and every scope, allowance, and price change arrives as a written change order before the work happens. No surprise invoice at the end. Our crews are background-checked and carry the Barrett & Sons name. Around Bedford, folks have been burned by contractors who promised the world on the phone and handed over a different bill at the door – we work the opposite way. If something’s wrong, you call and we come back.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Bedford
ADU Design & Permitting
An accessory dwelling unit on a Bedford lot is a design-and-approval project before it’s a construction project. We handle the drawings, the submittal packet for the Architectural Review Committee, and the permit filing, so your proposed height, roof pitch, and brick veneer match what the neighborhood expects. The approval window is why a Bedford ADU often takes longer to get moving than homeowners expect.

Room Additions
A room addition in Bedford almost always means tying new load-bearing walls into original 1960s-80s brick veneer and slab. We start with a foundation assessment, because the expansive clay under these homes has often shifted. Repairs to original plumbing and electrical are part of the deal, and the new rough-in has to meet current code while keeping the low-pitch roofline the review committee wants to see.

Second Story Additions
For families outgrowing their ranch but not ready to leave Bedford, a second story is often the answer – it uses the lot you already own. Height compatibility with surrounding single-story homes is the first thing the review committee checks, so we design the second floor to read as a natural extension rather than an add-on. Structural reinforcement of the existing framing comes first on these.

Garage Conversion ADU
A garage conversion is the fastest route to an ADU in Bedford because the shell is already there. Utilities, insulation, egress, and proper permitting still have to happen, and the ceiling height and slab need a look before we commit to a layout. It’s a good fit for a rental unit, an aging parent, or a home office with its own entrance.
Trusted Brands We Service in Bedford
Finishes matter as much as framing on an addition, and we install premium brands you can look up instead of mystery labels off a van. In ADU and addition bathrooms we regularly set Toto fixtures and Schluter waterproofing systems, and Grohe fittings turn up in the wet areas where the plumbing quality shows. The materials and their warranties travel with the finished room, and we’re glad to go over what’s specified for your build before anything is ordered.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Bedford Homes
- Designs that ignore compatibility. A room addition or ADU plan with a proposed height, roof pitch, or brick veneer that doesn’t match neighboring tract homes gets bounced at architectural review and sent back for months of redesign.
- Skipping foundation work. The expansive black clay under slab-on-grade homes in Bedford moves seasonally. If piers or drainage corrections are needed and skipped before framing, you get cracked slabs and failed inspection sign-off later.
- Scheduling without the review window. Trades lined up before the 4-6 week architectural review and permit issuance can leave a project sitting half-finished, or force costly change orders when the draw schedule slips.
- Aging utility tie-ins. Original cast-iron or early PVC plumbing and aluminum or first-generation double-pane windows in these homes often need upgrades the moment you cut into a wall for an addition.
Pricing for Home Additions & ADU in Bedford, TX
Honest numbers, in writing. A typical home addition in Bedford runs $45,000-$130,000, an ADU construction project runs $90,000-$220,000, and a garage conversion runs $30,000-$80,000. Your final figure is set by the foundation scope, the design review back-and-forth, the finish level you choose, and how much of the existing mechanical and plumbing has to be brought up to code. We hand you a written line-item quote with allowances spelled out, and every change order comes before the work – never after. Most jobs are eligible for our 90-Day Done Right Promise. Call (888) 590-9867 for a free estimate.
| Service | Typical Range in Bedford |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
We Also Serve Cities Near Bedford
If you’re just outside Bedford, we handle the same additions and ADU work in Hurst, Colleyville, Richland Hills, and North Richland Hills. The permitting rules shift a little from one to the next, so we scope each job to its own city rather than using a one-size template. Learn more about Home Additions & ADU in Bedford and the surrounding area we serve.
Serving Bedford, TX – Our Local Coverage Area
We serve Bedford and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Bedford
Bedford’s Architectural Review Committee checks proposed style, materials, and height against the surrounding 1960s-1980s tract homes. In practice that means matching brick veneer, keeping the roof pitch and height in line with the neighborhood, and submitting plans that read as a natural fit rather than an obvious add-on. Our Home Additions & ADU team prepares the submittal package and files it for you.
Plan on roughly 4-6 weeks of review before permits can be issued. We schedule the calendar around that window from day one so trades aren’t left waiting and the job isn’t sitting half-finished when the draw schedule shifts. Call (888) 590-9867 for a timeline built around your project.
Because the expansive black clay under slab-on-grade homes here swells and shrinks seasonally, additions often trigger foundation and drainage rework before a single wall goes up. We start every addition with a foundation assessment and bring in piers or drainage corrections where they’re needed. Skipping that step is how you end up with cracked slabs later.
Yes – a garage conversion to a living unit requires permits, and inspections are done in stages as the work proceeds. We pull the permits, walk the inspections, and get them signed. Our crews are experienced at bringing rough-in plumbing and electrical up to current code, and the convertible shell still has to pass egress, insulation, and utility checks.
Every allowance is on the written quote before work begins, and any scope or price change arrives as a written change order before the work happens. An allowance that isn’t on paper is a surprise waiting for a date, so we don’t leave anything off the document. Call (888) 590-9867 and we’ll go through the quote line by line.
Whether it’s a second story for a growing family or a detached ADU in the backyard, the first step is a free estimate and a conversation about what Bedford’s review and permit process will require of your specific property. Call (888) 590-9867 today – a live person answers, day or night – and we’ll get you a written quote with the scope spelled out and our 90-Day Done Right Promise behind the work.