Last updated November 17, 2026
Windows & doors
Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
How Long Does Windows & Doors Take? Timelines and What to Expect
A crew can install six windows in a day. What takes three to six weeks is everything that happens before they show up, and nobody explains that part until after you’ve signed. That gap between the day you sign and the day a crew pulls into your driveway is where most homeowners get blindsided, because the quote they got on the phone said “two days” and nobody mentioned the manufacturing clock. In Arlington, where ranch homes from the 1960s and 70s still carry their original aluminum units, the gap can stretch longer when a custom size gets ordered. This guide walks the whole calendar, phase by phase, so you know what you’re actually committing to before the pen touches paper.
Quick Answer
A typical window replacement project takes 4 to 8 weeks from signed contract to final inspection. The actual installation is usually 1 to 3 days for most homes. The bulk of the time is spent on the in-home measure, order placement, manufacturing lead time, and delivery, with a short window at the end for any required inspections. Door replacement follows a similar arc, though entry doors often carry slightly longer lead times on custom sizing.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Table of Contents
- The Full Window and Door Project Calendar, Phase by Phase
- Current Lead Times for Quality Window Lines in the DFW Market
- How Many Windows or Doors a Crew Can Realistically Install Per Day
- What Can Delay Your Project in Arlington
- Why We Won’t Start on a Date We Can’t Commit To
- Permits, Inspections, and the Final Sign-Off
- Door Timelines: Why Entry Doors Run a Different Clock
- Questions to Ask Before You Sign Anything
The Full Window and Door Project Calendar, Phase by Phase
If you remember nothing else from this guide, remember this: the install date is the shortest part of the timeline. Everything upstream dictates the schedule. Here’s how the calendar actually breaks down.
- In-home measure (day 1, about 60 to 90 minutes). This is not a phone estimate. A proper measure means someone stands at each opening with a tape and a level, checks the sill for rot or settlement, and confirms that the glass package and frame depth will clear the existing rough opening. Skipping this step is how a “standard size” order becomes a re-order, and that’s a four-week penalty on your calendar.
- Order placement (2 to 5 business days after measure). The dealer or manufacturer needs a signed contract and a confirmed spec sheet before production starts. On premium lines like Andersen or Marvin, that spec sheet runs several pages and covers frame material, glass package, grille pattern, and hardware finish. Every line has a lead time attached, and the longest line sets the order date.
- Manufacturing lead time (2 to 4 weeks for most lines). Standard-sized units from a stock line often ship faster. Custom sizes, specialty glass, and non-standard colors run longer. More on this below.
- Delivery and staging (1 to 3 days before install). The units arrive at the job site or a local staging point, get inspected for freight damage, and get staged in a way that keeps them out of the weather and out of the crew’s path.
- Installation (1 to 3 days for most homes). Detailed below.
- Inspection and close-out (the week after install). If your project required a window replacement permit, the inspection gets scheduled and the paperwork signed before final payment. In Arlington, that inspection window typically runs 1 to 5 business days depending on the city’s inspection load.
Stack that up and you’re looking at 4 to 8 weeks for the average home. A simple one-room project with stock sizes can land closer to the four-week end. A whole-house project with custom units and mixed sizing can push past eight.
Current Lead Times for Quality Window Lines in the DFW Market
Lead times in the DFW market have settled considerably from the wild swings of the last several years, but they are still not back to pre-2020 norms. Here’s what we’re seeing on the brands we install, like Andersen and Marvin:
- Stock-sized vinyl and fiberglass units (Andersen 100 Series, similar): 2 to 3 weeks in most cases.
- Custom-sized vinyl and fiberglass: 3 to 4 weeks.
- Wood-clad and premium fiberglass (Andersen 400 Series, Marvin Elevate): 3 to 5 weeks, driven mostly by color finish.
- Full custom wood (Marvin Signature): 5 to 8 weeks, occasionally longer for specialty glass or unusual grille patterns.
- Impact-rated glass packages: add 1 to 2 weeks to the line above.
Two factors push these numbers around. The first is seasonality: order volume in the DFW market spikes in late winter and early spring as homeowners plan projects before summer heat sets in, and lead times drift up accordingly. The second is glass packages. A simple double-pane Low-E unit is a stock item. A triple-pane, laminated, or solar-control package may be a factory build, and that puts you on a different production queue entirely.
If your home needs a matching refresh on the exterior after install, timing the related work matters too. A fence replacement or driveway paver project along the same elevation can be sequenced after the window install so the crew isn’t tripping over materials. We often coordinate those schedules when a homeowner is planning Fence Installation in Arlington or Driveway & Pavers in Arlington at the same time.
How Many Windows or Doors a Crew Can Realistically Install Per Day
This is where the “two-day project” quotes come from, and where the honest math lives. A skilled crew can install a window in 45 minutes to an hour when nothing goes wrong. But “nothing goes wrong” is doing a lot of work in that sentence. The time-consuming part is not the window, it’s the preparation and the seal.
Here’s the realistic daily production on standard single-hung or double-hung replacements:
- Small upstairs windows (no ladder work, easy access, no rot): 8 to 10 per day per crew.
- Standard ground-floor windows: 6 to 8 per day per crew.
- Large picture windows or units requiring two installers: 3 to 5 per day per crew.
- Sliding patio doors: 2 to 3 per day per crew, sometimes 1 if the opening requires framing changes.
- Entry doors: 1 to 2 per day per crew, and often just 1 on older homes.
Why slower than you’d expect? Because a proper install does not just pop the old unit out and slide the new one in. It includes:
- Removing the old unit and the surrounding trim without damaging the siding or drywall.
- Inspecting the rough opening for rot, settled framing, or insect damage, and addressing it before the new unit goes in (more on this below).
- Setting the new unit level, plumb, and square.
- Flash and seal: sill pan, backer rod, sealant, and the weather barrier tie-in.
- Reinstalling interior and exterior trim, and rebuilding any damaged drywall returns.
- Testing operation and doing a final seal check.
Rushing that list is how you get air infiltration, water stains on drywall after the first hard rain, and a window that sticks when Arlington’s summer humidity swells the frame. Speed has a cost. The cost shows up 18 months later.
What Can Delay Your Project in Arlington
Four delay categories show up over and over. Knowing them in advance lets you plan around them.
1. Special-order sizes in older Arlington homes
Arlington has a large inventory of 1950s through 1970s ranch and split-level homes. In those homes, window openings are rarely the “standard” dimensions the trade works to today. Original aluminum sliding units often sat in rough openings that measure a half-inch off from anything the factory stocks. When that happens, the order goes out as a custom build, and that adds one to three weeks to the calendar. It’s not a mistake. It’s the reality of the house.
2. Rotted framing discovered during removal
We see this in roughly one in four older homes, and it’s almost always on the south or west elevation where sun and rain do the most work. Once the old unit comes out, the sill or lower frame is exposed, and if it’s soft, it needs to come out and be rebuilt. That adds a day of carpentry and requires the right lumber on hand. On a project that’s already scheduled, we’ll issue a written change order before proceeding so you know exactly what’s being added and why.
3. Permit hold requirements
Arlington issues window replacement permits under specific conditions, and some projects require a review that takes a few extra days. If the permit holds the install date, it holds. We don’t start without it, because an inspection signed off on a permitted job is one of the few pieces of paper that protects you when you sell the house.
4. Weather
Rain is the obvious one, but in a North Texas summer, extreme heat matters too. We don’t install windows on a 105-degree afternoon if the sealant won’t cure properly. The window sits for a day, and the schedule shifts. This is rare, but it happens.
Why We Won’t Start on a Date We Can’t Commit To
Here’s a question worth asking any contractor before you sign: “What’s the actual install date, and what could move it?” If the answer is vague, that’s a warning sign. A real schedule has a projected install date backed by a confirmed manufacturer ship date, and that date is negotiable only when everything upstream confirms.
At Barrett & Sons Construction, the whole process runs on scope in writing, allowances in writing, and change orders in writing. When something changes (a rotted sill, a custom size, a factory delay), we don’t just call you and ask for a verbal okay. We issue a written change order, describe the change, price the change, and wait for your signature before a nail moves. That policy applies to the schedule the same way it applies to the scope. You always know what’s happening and what it will cost. If you’re planning a larger project that touches framing, we often do the same for Home Additions & ADU in Arlington where the window and door schedule has to coordinate with the structural work.
The reason we hold this line is simple: the alternative is a contractor who promises a date to close the sale, then moves it twice, then shows up without the right trim and asks you to live with it. We won’t do that. If we can’t commit to a date, we tell you that instead.
Permits, Inspections, and the Final Sign-Off
Window replacement sometimes doesn’t need a permit and sometimes does. The rules vary by scope and by city. In Arlington, permitted work is inspected by a city inspector who checks the installation against code: proper flashing, correct egress on bedroom windows, and in some cases a wind-load requirement. That inspection is not a hassle. It’s the piece of paper that proves the work was done right when you go to sell, and it’s why we pull and pass inspections on every eligible job.
The inspection window itself takes time. Once install is complete, the city schedules the inspection, usually 1 to 5 business days later in Arlington. The inspector signs off, the paperwork closes, and that’s when the job is genuinely finished. Ask any contractor you’re talking to whether their schedule includes the inspection window. If they’re quoting you a completion date that ends at the last window install, they’ve skipped a step.
Door Timelines: Why Entry Doors Run a Different Clock
Entry doors, patio doors, and French doors follow a similar calendar arc but with their own quirks. Custom entry doors almost always run longer on lead time than windows because the spec includes the slab, the frame, the hardware preps, the finish, and the sidelight configuration. We see 4 to 8 weeks on custom entry doors from the order date, sometimes longer if the finish is a non-standard stain.
Installation is also more involved. An entry door replacement on an older Arlington home often uncovers framing issues at the threshold, and the install itself includes adjusting the frame for a weather-tight fit, shimming the hinges, and checking the strike plate alignment. A patio sliding door has similar pace to a large window, often 2 to 3 hours per unit, sometimes more when the opening requires framing work. The whole-home timeline on a door project is usually 5 to 8 weeks from contract to inspection.
Questions to Ask Before You Sign Anything
Bring this list to your next contractor meeting. The answers will tell you whether the timeline you’re given is real.
- “What’s the manufacturer’s confirmed ship date?” Not the estimated lead time, the confirmed ship date tied to your order number.
- “What’s the projected install date, and what could move it?” If the answer is vague, the schedule is vague.
- “How many windows per day can your crew install without rushing the flashing?” A good answer walks through the pace honestly.
- “What happens if you find rotted framing?” The right answer includes a written change order before proceeding.
- “Will you pull the permit and schedule the inspection?” If they say permits are optional, walk away.
- “What’s the warranty on installation?” Our answer is the 90-Day Done Right Promise, written on every contract.
Common Mistakes to Avoid
- Confusing install time with project time. The crew may finish in two days, but the project started weeks earlier. Ask for the full calendar, not just the install window.
- Signing before the measure. A phone estimate is a guess. Get the in-home measure and the confirmed spec sheet before you authorize the order.
- Assuming standard sizing fits your Arlington home. In a 1960s ranch, “standard” is a marketing word. The tape measure tells the truth.
- Doubting the permit requirement because the last contractor said it wasn’t needed. The permit is your protection, and the inspector works for you, not for us.
- Scheduling the exterior trim or siding work before the window install. Sequence the window install first, then the finishing work.
- Choosing the cheapest bid without asking about lead time. If a bid is dramatically lower, the base line is usually a lower-grade unit or a longer lead time.
- Overlooking the glass package in the lead time conversation. A triple-pane or impact-rated order is on a different production clock than a stock unit, and the slip is common.
See the difference
Before
After
Before
After
Before
AfterWhen to Call a Professional
Some window and door work is a job for a pro every time, no exceptions. Call us when the windows are fogged between the panes, when a window won’t close fully or lock, when there’s visible rot around the frame or sill, when a door has begun to stick and the threshold shows water staining, or when you’re looking at a whole-home replacement and don’t know where to start. Two situations also warrant a call: any window that leaks during a hard rain, and any bedroom window whose egress opening no longer meets code. Those are safety issues, not cosmetic ones.
For a professional crew that pulls the permit, installs premium brands like Andersen and Marvin, and backs the work with a written promise, Barrett & Sons Construction Arlington offers free estimates in Arlington. We’re owner-operated, our crew members are background-checked, and we’ve served local communities for over 29 years. Call (888) 590-9867 to schedule a measure and get a written timeline before you commit.
Frequently Asked Questions
Most Arlington window replacement projects take 4 to 8 weeks from signed contract to final inspection, with installation itself covering 1 to 3 days. The bulk of the time is measure, order, manufacturing lead time, delivery, and inspection. Call (888) 590-9867 for an exact timeline based on your home and the window line you choose.
Sometimes, yes, for a small project with stock sizes and no complications. A crew can install 6 to 8 standard windows in a day without rushing the seal and flashing work. A whole-home project typically runs 2 to 3 days. Call (888) 590-9867 to find out what your specific project requires.
Manufacturing lead time is the cause. Standard-sized units from a stock line often ship in 2 to 3 weeks, while custom sizes, specialty glass, and premium wood-clad units run 3 to 5 weeks, and full custom wood can run 5 to 8. Call (888) 590-9867 to confirm current lead times on the line you’re considering.
It depends on the scope and the age of the home. Some projects require a window replacement permit and a city inspection, and some don’t. We pull the permit when required and schedule the inspection, because the sign-off protects you at resale. Call (888) 590-9867 and we’ll tell you whether your project needs one.
We stop, document the damage, and issue a written change order that describes the repair and prices it before any work continues. You sign before we proceed. That’s how we protect the schedule and the budget at the same time. Call (888) 590-9867 for a free second opinion on any written estimate you’ve already received.
Custom entry doors typically run 4 to 8 weeks from order date, sometimes longer with a specialty finish, and installation takes 1 to 2 days. Patio sliding doors move faster, closer to the window timeline. Call (888) 590-9867 to get a timeline specific to the door you’re considering.
The Bottom Line
Window and door timelines are misstated because contractors quote installation time and skip the lead time, delivery, and inspection window that make up most of the project. The honest arc is 4 to 8 weeks from signed contract to final inspection, with install itself taking 1 to 3 days for most homes. The variables that move the date are real: custom sizes in older Arlington homes, rotted framing found during removal, factory lead times on premium lines like Andersen and Marvin, and the inspection window at the end. If your contractor can’t answer “What’s the confirmed ship date?” and “What’s the projected install date?” with specifics, you don’t have a schedule yet. You have a guess. Call (888) 590-9867 for a free estimate and a written timeline you can actually plan around. And if you’re looking at other projects around the same time, our team at Barrett & Sons Construction Arlington home can help you line up the schedule so the work doesn’t collide.
Written by the team at Barrett & Sons Construction Arlington.